IMPROVING OUR TRAILS

Approximately 80% of our trails are connected and the last 20% are the most challenging. In order to address that last 20%, Stephen was instrumental in obtaining in the 2019 budget funding for bridge construction.The bridge will be installed along route 63 at the Johnson and Johnson site and will connect the neighborhoods on Tennis Ave. The residents along Tennis Ave will have safe access to our trail systems.

VOLUNTEER